Plot No.64, 4th East Street, Kamaraj Nagar, Thiruvanmiyur, Chennai - 600041
E-mail: contact@keyeminfra.in
Follow us:
Archive
Completed Projects
2013
  1. Replacement of 140mm OD PVC 6KSC pipeline (Ls 0m to 1665) – CWSS to Marulpatti – Executive Engineer, TWAD, M Division, Tiruppur
  2. Replacement of 200mm DI K7 pipe (Ls 8235–8835) – Executive Engineer, TWAD, M Division, Tiruppur
  3. Replacement of 250mm DI K7 pipe (Ls 6100–6700) – Executive Engineer, TWAD, M Division, Tiruppur
  4. Replacement of 250mm DI K7 pipe (Ls 1800–2340) – CWSS to Poolankinar (Nahul Calamities 2013–14) – Executive Engineer, TWAD, M Division, Tiruppur
  5. Shifting of 150mm AC pipes to DI – CWSS to Thandalai – Executive Engineer, TWAD, M Division, Trichy
  6. Shifting of 250mm ACCI pipes to DI (Ls 3050–3300) – Booster Main I – Executive Engineer, TWAD, M Division, Trichy
  7. Shifting of 250mm ACCI pipes to DI (Ls 3300–3590) – Booster Main I – Executive Engineer, TWAD, M Division, Trichy
  8. Shifting of 250mm ACCI pipes to DI (Ls 2775–3050) – Booster Main I – Executive Engineer, TWAD, M Division, Trichy
  9. Shifting of 250mm ACCI pipes to DI (Ls 1970–2300) – Booster Main I – Executive Engineer, TWAD, M Division, Trichy
  10. Shifting of 250mm ACCI pipes to DI (Ls 2500–2775) – Booster Main I – Executive Engineer, TWAD, M Division, Trichy
  11. Shifting of 250mm ACCI pipes to DI (Ls 2300–2500) – Booster Main I – Executive Engineer, TWAD, M Division, Trichy
  12. Shifting of 200mm AC pipe to DI – Kottur to Velakkanatham – Executive Engineer, TWAD, M Division, Trichy
  13. 120HP Turbine Pump & 2×10HP Submersible Motors – Manapadai Veedu – The Commissioner, Tirunelveli Corporation
  14. NRHM O&M for Mylad G.H Campus (Nov 2013–Mar 2014) – Executive Engineer, TWAD, Sew Division, Nagapattinam
  15. S, D, L & J of 250 K7 (LS 13352–13976) – CWSS to Palacombai – Executive Engineer, RWS Division, Theni
  16. S, D, L & J of 250 K7 (LS 12612–13382) – CWSS to Palacombai – Executive Engineer, RWS Division, Theni
  17. S, D, L & J of 300 K7 (LS 11887–12612) – CWSS to Palacombai – Executive Engineer, RWS Division, Theni
  18. S, D, L & J of 300 K7 (LS 11225–11887) – CWSS to Palacombai – Executive Engineer, RWS Division, Theni
  19. S, D, L & J of 300 K7 (LS 10575–11225) – CWSS to Palacombai – Executive Engineer, RWS Division, Theni
  20. S, D, L & J of 300 K7 (LS 9925–10575) – CWSS to Palacombai – Executive Engineer, RWS Division, Theni
  21. S, D, L & J of 300 K7 (LS 9275–9925) – CWSS to Palacombai – Executive Engineer, RWS Division, Theni
  22. S, D, L & J of 300 K7 (LS 8625–9275) – CWSS to Palacombai – Executive Engineer, RWS Division, Theni
  23. S, D, L & J of 300 K7 (LS 7975–8625) – CWSS to Palacombai – Executive Engineer, RWS Division, Theni
  24. S, D, L & J of 300 K7 (LS 7325–7975) – CWSS to Palacombai – Executive Engineer, RWS Division, Theni
  25. S, D, L & J of 300 K7 (LS 6675–7325) – CWSS to Palacombai – Executive Engineer, RWS Division, Theni
  26. S, D, L & J of 250 DI K7 (LS 5580–5880) – CWSS to Manapatti Jothipalayam – Executive Engineer, TWAD, M Division, Tiruppur
  27. S, D, L & J of 150mm DI K7 (LS 0–300) – CWSS to Jallipatti – Executive Engineer, TWAD, M Division, Tiruppur
  28. Replacement of 250mm AC pipe with DI K7 (LS 3465–4100) – CWSS to Poolankinar – Executive Engineer, TWAD, M Division, Tiruppur
  29. S, D, L & J of 250 DI K7 (LS 1800–2150) – CWSS to Sellappampalayam – Executive Engineer, TWAD, M Division, Tiruppur
  30. WSIS to Ayyampettai Town Panchayat – The Chief Engineer, TWAD Board, Tanjore
  31. WSIS to Thirunageswaram Town Panchayat – The Chief Engineer, TWAD Board, Tanjore
  32. WSIS to Dharasuram Town Panchayat – The Chief Engineer, TWAD Board, Tanjore
  33. WSS to Tirunelveli Medical College – The Chief Engineer, TWAD Board, Madurai
  34. Drought 2013 – 150HP VTP at Kondanagaram – The Commissioner, Municipal Corporation, Tirunelveli
  35. Drought 2013 – 120HP VTP at Kondanagaram (Melapalayam) – The Commissioner, Municipal Corporation, Tirunelveli
  36. Thane Cyclone Relief – 250 DI K7 (148m) – Executive Engineer, URB Division, Cuddalore
  37. Firefighting Arrangements – Perumbakkam – SE, JNNURM, TNSCB, Chennai
  38. 450 Dia DI Pumping Main – Stage II (3.6km) – The Commissioner, Kumbakonam Municipality
  39. Connecting Main to CWSS to Kadambur (180m) – SE, TWAD, Kovilpatti
  40. Construction of IW (4.5m dia × 2 nos) – Seevalaperi Head Works – Executive Engineer, M Division, Tuticorin